在进行环氧地坪施工时需要做好现场管理
为了确保环氧地坪漆工程能够按照施工计划正常进行,保障环氧地坪漆施工人员的安全,在进行环氧地坪漆工程施工时需要做好现场管理,主要内容如下:1、项目经理为环氧地坪漆工程的安全生产第一责任人。贯彻“安全第一,质量为本,系统管理,规范施工,过程监控”的方针。
In order to ensure that the epoxy floor paint project can proceed normally according to the construction plan and ensure the safety of the construction personnel, site management should be done well in the construction of the epoxy floor paint project. The main contents are as follows: 1. Project manager is the first person responsible for the safety production of the epoxy floor paint project. Implement the policy of "safety first, quality first, system management, standardized construction, process monitoring".
2、加强对现场环氧地坪漆施工工人的安全生产教育,从项目施工队伍进场到工程竣工交付使用,安全生产教育必须贯穿于施工全过程中,要有组织、有目的、定期有针对性的进行职工安全生产教育,增加职工安全生产意识。
2. Strengthen the safety production education for the construction workers of on-site epoxy floor paint. From the entry of the project construction team to the completion of the project, the safety production education must run through the whole process of construction. It should organize, purposefully and regularly carry out the safety production education for the workers and increase their awareness of safety production.
3、临时电源配电箱及电缆都应完好,不得有破损、漏电现象,临时电源配电箱应有漏电保护装置。施工临时用电必须由专业电气施工人员进行操作,工具的绝缘状态、电源线、插头和插座要求完好无损,电源线不得任意接长或调换维修和检查由专业人员负责,杜绝无证上岗,乱拉乱接;进入施工场地的人员必须戴好安全帽。
3. Temporary power distribution boxes and cables should be in good condition. There should be no damage or leakage. Temporary power distribution boxes should have leakage protection devices. Construction temporary electricity must be operated by professional electrical constructors. The insulation state of tools, power cord, plugs and sockets should be intact and intact. The power cord should not be arbitrarily lengthened, replaced, repaired and inspected by professional personnel, so as to prevent undocumented induction and disorderly connection. Personnel entering the construction site must wear safety caps.
4、环氧地坪漆材料进入现场后应按要求分类、分规格堆放,并堆放整齐、稳固,要求布置合理,秩序井然,搬运时应轻拿轻放。合理地组织环氧地坪漆材料使用,减少地坪漆材料的损耗。
4. Epoxy floor paint materials should be classified and stacked in accordance with the requirements and specifications. They should be orderly and orderly. They should be handled lightly. Rationally organize the use of floor paint materials to reduce the loss of floor paint materials.
5、现场管理人员及劳务施工人员必须购买意外伤害保险,无保险人员严禁进入施工现场。
5. On-site management personnel and labor construction personnel must purchase accident injury insurance. No uninsured personnel are allowed to enter the construction site.